Florida Department of Environmental Protection

This data is current as of: June 4, 2020

Clear Dot Image
Select a Permit Type to View Specific Information
Permit Type
Total Under Review
Air - Construction Permit  
64
Air - General Permit  
33
Air - Operation Permit  
23
Air - Title V Operation Permit  
47
Construction Generic Dewatering Large  
4
Construction Generic Dewatering Small  
7
Domestic Wastewater Biosolids  
2
Ecosystems Management Agreement  
3
Everglades - ERP Exemption Permit  
1
Everglades - IW Group 7A, Design Daily Flow >500,000 GPD Permit  
10
Everglades CERPRA-CE  
8
Everglades EFA-EF  
3
IW Dewatering Operations  
4
Joint Application Electronic Submittal  
10
MS2, > 10-50K  
9
MS2, >50K  
2
MSE, < OR = 10K or Other  
14
Oil and Gas Permit  
4
Other Reclamation  
2
Phosphate Reclamation  
3
Siting Act Project New Application  
1
Stormwater - Individual Stormwater Permit  
1
Stormwater - Large Construction (>= 5 AC)  
10
Stormwater - Multisector Generic Permit  
3
Stormwater - Small Construction (1-5 AC)  
28
Waste - Hazardous Waste Operation Permit  
3
Waste - Solid Waste Closure Permit  
2
Waste - Solid Waste Construction Permit  
6
Waste - Solid Waste Operation Permit  
29
Waste - Waste Tire Permit  
7
Water - Beaches CCCL General Permit  
3
Water - Beaches Construction Individual Permit  
189
Water - Beaches ERP Conceptual Approval  
1
Water - Beaches ERP Individual Permit  
3
Water - Beaches ERP Minor Modification  
1
Water - Beaches JCP Major Modification  
4
Water - Beaches JCP Minor Modification  
9
Water - Beaches JCP Proprietary  
1
Water - Domestic Wastewater Collection/Transmission System  
204
Water - Domestic Wastewater Facility Permit  
4
Water - Domestic Wastewater Type I Facility Permit  
6
Water - Domestic Wastewater Type I Residuals/Septage Management Facility Permit  
3
Water - Domestic Wastewater Type I Reuse/Land Application System Permit  
3
Water - Domestic Wastewater Type I Wastewater Treatment Plant Permit  
41
Water - Domestic Wastewater Type II Facility Permit  
1
Water - Domestic Wastewater Type II Wastewater Treatment Plant Permit  
12
Water - Domestic Wastewater Type III (less than 10,000 gpd) Wastewater Treatment Plant Permit  
11
Water - Domestic Wastewater Type III Facility Permit  
1
Water - Domestic Wastewater Type III Residuals/Septage Management Facility Permit  
1
Water - Domestic Wastewater Type III Wastewater Treatment Plant Permit  
31
Water - Dredge and Fill Permit  
1
Water - Drinking Water Distribution System General Permit  
53
Water - Drinking Water Distribution System Permit  
13
Water - Drinking Water Treatment Construction Permit  
19
Water - ERP Conceptual Approval Permit  
2
Water - ERP Exemption Permit  
447
Water - ERP Formal Determination  
49
Water - ERP Modifications  
67
Water - ERP Noticed General Permit  
157
Water - ERP Variance  
2
Water - Individual With No Conceptual Approval Permit  
417
Water - Industrial Wastewater Concrete Batch Plant Permit  
15
Water - Industrial Wastewater Facility Permit  
10
Water - Industrial Wastewater Group 1, Non-surface Water Discharge Permit  
3
Water - Industrial Wastewater Group 1, Surface Water Discharge Permit  
34
Water - Industrial Wastewater Group 10B - Other Facility Permit  
6
Water - Industrial Wastewater Group 2, Non-surface Water Discharge Permit  
1
Water - Industrial Wastewater Group 3, Non-surface Water Discharge Permit  
1
Water - Industrial Wastewater Group 3, Surface Water Discharge Permit  
3
Water - Industrial Wastewater Group 4A, Feedlots W/> Than Number Of Listed Animals Permit  
4
Water - Industrial Wastewater Group 5A, Design Daily Discharge >500,000 GPD Permit  
3
Water - Industrial Wastewater Group 5C, Design Daily Discharge >10,000 to 100,000 GPD Permit  
3
Water - Industrial Wastewater Group 5d, Design Daily Discharge 10,000 or Less GPD Permit  
1
Water - Industrial Wastewater Group 6C, >1 Million BTU/HR Heat Loss Up to 20 Million Permit  
2
Water - Industrial Wastewater Group 7A, Design Daily Flow >500,000 GPD Permit  
2
Water - Industrial Wastewater Group 7B, Design Daily Flow >100,000 Up to 500,000 GPD Permit  
1
Water - Industrial Wastewater Group 7C, Design Daily Flow >50,000 Up to 100,000 GPD Permit  
1
Water - Industrial Wastewater Group 7D, Design Daily Flow 50,000 or Less GPD Permit  
2
Water - Industrial Wastewater Group 8B, Design Daily Flow >100,000 to 500,000 GPD Permit  
1
Water - Industrial Wastewater Group 8C, Design Daily Flow >50,000 to 100,000 GPD Permit  
3
Water - Industrial Wastewater Group 8D, Design Daily Flow of 50,000 or Less GPD Permit  
1
Water - Industrial Wastewater Group 9B, Recycling 10,000 or Less GPD Permit  
3
Water - Industrial Wastewater Petroleum Cleanup Site Permit  
1
Water - Injection Well Construction Permit  
51
Water - Injection Well Operation Permit  
119
Water - Injection Well Plug and Abandonment Permit  
1
Water - Joint Coastal Permit  
16
Water - Mangrove Alterations Permit  
24
Water - Mangrove Exemptions  
3
Water - Mitigation Bank Permit  
4
Water - Underground Injection Control - Construction/Operation Permit  
2

Contact The Office of Public Services whenever you have questions or concerns about the permit data.