Select a Permit Type to View Specific Information
|
Permit Type
|
Total Under Review
|
Air - Construction Permit |
68 |
Air - Federally Enforceable State Operating Permit (FESOP) |
1 |
Air - General Permit |
40 |
Air - Operation Permit |
30 |
Air - Title V Operation Permit |
44 |
Beach Management Agreement |
2 |
Construction Generic Dewatering Large |
5 |
Construction Generic Dewatering Small |
6 |
Domestic Wastewater Biosolids |
20 |
Ecosystems Management Agreement |
7 |
Everglades - ERP Exemption Permit |
1 |
Everglades - IW Group 7A, Design Daily Flow >500,000 GPD Permit |
10 |
Everglades - State 404 Individual Permit |
2 |
Everglades CERPRA-CE |
12 |
Everglades EFA-EF |
1 |
Heavy Minerals Reclamation |
1 |
IW Dewatering Operations |
11 |
MS2, > 10-50K |
37 |
MS2, >50K |
18 |
MSE, < OR = 10K or Other |
45 |
Oil and Gas Permit |
12 |
Stormwater - Individual Stormwater Permit |
2 |
Stormwater - Large Construction (>= 5 AC) |
4 |
Stormwater - Multisector Generic Permit |
5 |
Stormwater - Municipal Separate Storm Sewer Systems |
24 |
Stormwater - No Exposure Certification |
3 |
Stormwater - Small Construction (1-5 AC) |
2 |
Waste - Hazardous Waste Closure Permit |
1 |
Waste - Hazardous Waste Operation Permit |
9 |
Waste - Solid Waste Closure Permit |
13 |
Waste - Solid Waste Construction Permit |
14 |
Waste - Solid Waste Operation Permit |
63 |
Waste - Waste Tire Permit |
10 |
Water - Beaches CCCL General Permit |
5 |
Water - Beaches Construction Individual Permit |
347 |
Water - Beaches ERP Individual Permit |
1 |
Water - Beaches ERP Major Modification |
1 |
Water - Beaches Exemption |
5 |
Water - Beaches JCP Major Modification |
1 |
Water - Beaches JCP Minor Modification |
7 |
Water - Domestic Wastewater Collection/Transmission System |
275 |
Water - Domestic Wastewater Facility Permit |
9 |
Water - Domestic Wastewater Type I Facility Permit |
15 |
Water - Domestic Wastewater Type I Residuals/Septage Management Facility Permit |
4 |
Water - Domestic Wastewater Type I Reuse/Land Application System Permit |
4 |
Water - Domestic Wastewater Type I Wastewater Treatment Plant Permit |
64 |
Water - Domestic Wastewater Type II Facility Permit |
4 |
Water - Domestic Wastewater Type II Residuals/Septage Management Facility Permit |
1 |
Water - Domestic Wastewater Type II Wastewater Treatment Plant Permit |
33 |
Water - Domestic Wastewater Type III (less than 10,000 gpd) Wastewater Treatment Plant Permit |
20 |
Water - Domestic Wastewater Type III Facility Permit |
5 |
Water - Domestic Wastewater Type III Residuals/Septage Management Facility Permit |
4 |
Water - Domestic Wastewater Type III Satellite Treatment System Permit |
2 |
Water - Domestic Wastewater Type III Wastewater Treatment Plant Permit |
94 |
Water - Dredge and Fill Permit |
3 |
Water - Drinking Water Distribution System General Permit |
61 |
Water - Drinking Water Distribution System Permit |
37 |
Water - Drinking Water Treatment Construction Permit |
50 |
Water - ERP Conceptual Approval Permit |
1 |
Water - ERP Exemption Permit |
1233 |
Water - ERP Formal Determination |
45 |
Water - ERP Modifications |
127 |
Water - ERP Noticed General Permit |
237 |
Water - Individual With No Conceptual Approval Permit |
1129 |
Water - Industrial Wastewater Concrete Batch Plant Permit |
15 |
Water - Industrial Wastewater Facility Permit |
9 |
Water - Industrial Wastewater Group 1, Non-surface Water Discharge Permit |
4 |
Water - Industrial Wastewater Group 1, Surface Water Discharge Permit |
26 |
Water - Industrial Wastewater Group 10B - Other Facility Permit |
8 |
Water - Industrial Wastewater Group 2, Non-surface Water Discharge Permit |
1 |
Water - Industrial Wastewater Group 3, Non-surface Water Discharge Permit |
1 |
Water - Industrial Wastewater Group 3, Surface Water Discharge Permit |
2 |
Water - Industrial Wastewater Group 4A, Feedlots W/> Than Number Of Listed Animals Permit |
5 |
Water - Industrial Wastewater Group 5A, Design Daily Discharge >500,000 GPD Permit |
1 |
Water - Industrial Wastewater Group 5B, Design Daily Discharge >100,000 to 500,000 GPD Permit |
1 |
Water - Industrial Wastewater Group 5C, Design Daily Discharge >10,000 to 100,000 GPD Permit |
1 |
Water - Industrial Wastewater Group 5d, Design Daily Discharge 10,000 or Less GPD Permit |
1 |
Water - Industrial Wastewater Group 6C, >1 Million BTU/HR Heat Loss Up to 20 Million Permit |
2 |
Water - Industrial Wastewater Group 7A, Design Daily Flow >500,000 GPD Permit |
5 |
Water - Industrial Wastewater Group 7C, Design Daily Flow >50,000 Up to 100,000 GPD Permit |
2 |
Water - Industrial Wastewater Group 7D, Design Daily Flow 50,000 or Less GPD Permit |
7 |
Water - Industrial Wastewater Group 8B, Design Daily Flow >100,000 to 500,000 GPD Permit |
2 |
Water - Industrial Wastewater Group 8C, Design Daily Flow >50,000 to 100,000 GPD Permit |
2 |
Water - Industrial Wastewater Group 8D, Design Daily Flow of 50,000 or Less GPD Permit |
5 |
Water - Industrial Wastewater Group 9A, Recycling >10,000 GPD Permit |
1 |
Water - Industrial Wastewater Group 9B, Recycling 10,000 or Less GPD Permit |
4 |
Water - Injection Well Construction Permit |
94 |
Water - Injection Well Operation Permit |
101 |
Water - Injection Well Plug and Abandonment Permit |
4 |
Water - Joint Coastal Permit |
18 |
Water - Mangrove Alterations Permit |
26 |
Water - Mangrove Exemptions |
3 |
Water - Mitigation Bank Permit |
2 |
Water - State 404 Emergency Permit |
1 |
Water - State 404 Exemption |
4 |
Water - State 404 General Permit |
486 |
Water - State 404 Individual Permit |
754 |
Water - State 404 No Permit Required |
495 |
Water - State 404 Permit Modification |
23 |
Water - State 404 Regional General Permit |
4 |
Water - Underground Injection Control - Construction/Operation Permit |
1 |
Water - WOTUS Determination with WMD Formal |
37 |