Florida Department of Environmental Protection

This data is current as of: March 5, 2026

Clear Dot Image
Select a Permit Type to View Specific Information
permit Type
Total Under Review
Air - Title V Operation Permit  
2
MS2, > 10-50K  
7
MS2, >50K  
2
MSE, < OR = 10K or Other  
3
Waste - Solid Waste Construction Permit  
1
Waste - Solid Waste Operation Permit  
2
Water - Beaches Construction Individual Permit  
29
Water - Domestic Wastewater Collection/Transmission System  
5
Water - Domestic Wastewater Type I Wastewater Treatment Plant Permit  
2
Water - Domestic Wastewater Type III (less than 10,000 gpd) Facility Permit  
1
Water - Domestic Wastewater Type III (less than 10,000 gpd) Wastewater Treatment Plant Permit  
2
Water - Domestic Wastewater Type III Wastewater Treatment Plant Permit  
3
Water - Drinking Water Distribution System General Permit  
4
Water - Drinking Water Distribution System Permit  
9
Water - Drinking Water Treatment Construction Permit  
7
Water - ERP Exemption Permit  
8
Water - ERP Noticed General Permit  
8
Water - Individual With No Conceptual Approval Permit  
25
Water - Industrial Wastewater Group 5B, Design Daily Discharge >100,000 to 500,000 GPD Permit  
1
Water - Industrial Wastewater Group 6D, 1 Million BTU/HR Heat Loss or Less Permit  
1
Water - Industrial Wastewater Group 7D, Design Daily Flow 50,000 or Less GPD Permit  
1
Water - Industrial Wastewater Group 8D, Design Daily Flow of 50,000 or Less GPD Permit  
1
Water - Injection Well Plug and Abandonment Permit  
1
Water - Mangrove Alterations Permit  
1
Water - State 404 General Permit  
11
Water - State 404 Individual Permit  
18
Water - State 404 No Permit Required  
18

Contact The Office of Public Services whenever you have questions or concerns about the permit data.