Select a Permit Type to View Specific Information
|
permit Type
|
Total Under Review
|
Air - Construction Permit |
2 |
Air - Federally Enforceable State Operating Permit (FESOP) |
1 |
Air - General Permit |
2 |
Air - Operation Permit |
1 |
MS2, > 10-50K |
6 |
MS2, >50K |
1 |
MSE, < OR = 10K or Other |
4 |
Waste - Hazardous Waste Operation Permit |
1 |
Waste - Solid Waste Closure Permit |
2 |
Waste - Solid Waste Construction Permit |
1 |
Waste - Solid Waste Operation Permit |
2 |
Water - Beaches Construction Individual Permit |
9 |
Water - Beaches Exemption |
1 |
Water - Domestic Wastewater Collection/Transmission System |
5 |
Water - Domestic Wastewater Type I Facility Permit |
2 |
Water - Domestic Wastewater Type I Wastewater Treatment Plant Permit |
1 |
Water - Domestic Wastewater Type III (less than 10,000 gpd) Wastewater Treatment Plant Permit |
1 |
Water - Domestic Wastewater Type III Wastewater Treatment Plant Permit |
1 |
Water - Drinking Water Distribution System General Permit |
1 |
Water - Drinking Water Distribution System Permit |
1 |
Water - Drinking Water Treatment Construction Permit |
3 |
Water - ERP Exemption Permit |
19 |
Water - ERP Modifications |
6 |
Water - ERP Noticed General Permit |
8 |
Water - Individual With No Conceptual Approval Permit |
34 |
Water - Industrial Wastewater Facility Permit |
2 |
Water - Industrial Wastewater Group 5C, Design Daily Discharge >10,000 to 100,000 GPD Permit |
1 |
Water - Industrial Wastewater Group 7A, Design Daily Flow >500,000 GPD Permit |
1 |
Water - Industrial Wastewater Group 8B, Design Daily Flow >100,000 to 500,000 GPD Permit |
1 |
Water - Industrial Wastewater Group 8D, Design Daily Flow of 50,000 or Less GPD Permit |
3 |
Water - Industrial Wastewater Petroleum Cleanup Site Permit |
1 |
Water - Injection Well Construction Permit |
3 |
Water - Injection Well Operation Permit |
4 |
Water - State 404 General Permit |
8 |
Water - State 404 Individual Permit |
18 |
Water - State 404 No Permit Required |
11 |