Florida Department of Environmental Protection
Bureau of Petroleum Storage Systems
Facility Inspection Cover Page
Facility Information

District: SWD Type: Retail Station
County: Pinellas Status: Open
Facility ID#: 8626382 Latitude: 27:52:50.8840
Name: Mcmullen Oil Co Inc Longitude: 82:41:56.2553
11965 49th St N LL Method: DPHO
Clearwater, FL 33762-4305 LL Status: REVIEWED
Contact: Tanya Mcmullen Status Date: 10//17/2003
Phone: 727-573-0016

Account Owner Information
Name: Mcmullen Oil Co Inc Effective Date: 03/14/1995
Po Box 17357 Placard#/Date: 590438 - 06/30/2020
Attn: Paul Mcmullen
Clearwater, FL 33762
Phone: 727-573-0016

Tank Owner Information
Name: Mcmullen Oil Co Inc Effective Date: 03/14/1995
Po Box 17357
Attn: Paul Mcmullen
Clearwater, FL 33762
Phone: 727-573-0016

Tank
#
Size Content Installed Placement Status Const Pipe Monitor
1 10000 Other Non Regulated
08/01/1984
UNDER
Z
A
G
B
8
2 10000 Other Non Regulated
08/01/1984
UNDER
Z
A
G
B
8
3 10000 Other Non Regulated
08/01/1984
UNDER
Z
A
G
B
8
10 20000 New/Lube Oil
08/01/2001
ABOVE
U
C
M
O
L
B
A
Q
6
11 20000 New/Lube Oil
08/01/2001
ABOVE
U
C
M
O
L
B
A
Q
6
12 20000 New/Lube Oil
08/01/2001
ABOVE
U
C
M
O
L
B
A
Q
6
13 20000 New/Lube Oil
08/01/2001
ABOVE
U
C
M
O
L
B
A
Q
6
14 20000 New/Lube Oil
08/01/2001
ABOVE
U
C
M
O
B
A
Q
6
15 10000 Unleaded Gas
08/01/2001
ABOVE
U
C
M
O
K
B
A
J
Q
6
18 20000 Vehicular Diesel
02/01/2003
ABOVE
U
C
M
O
K
B
A
J
Q
6
20 12000 Vehicular Diesel
03/01/2004
ABOVE
U
C
M
O
K
B
A
J
F
Q
6
26 8000 Vehicular Diesel
08/01/2008
ABOVE
U
C
M
O
Q
I
B
A
D
J
G
F
Q
6
27 8000 Vehicular Diesel
08/01/2008
ABOVE
U
C
M
O
Q
I
B
D
A
J
G
F
Q
6
17 15000 Unleaded Gas
10/01/2002
ABOVE
M



23 2000 Kerosene
03/01/2004
ABOVE
E
C


19 1200 New/Lube Oil
03/01/2004
ABOVE
B
21 1200 New/Lube Oil
03/01/2004
ABOVE
B
22 1200 New/Lube Oil
03/01/2004
ABOVE
B
24 1200 New/Lube Oil
03/01/2004
ABOVE
B
6 4000 New/Lube Oil
07/01/1986
ABOVE
B
7 4000 New/Lube Oil
07/01/1986
ABOVE
B
8 4000 New/Lube Oil
07/01/1986
ABOVE
B
9 4000 New/Lube Oil
07/01/1986
ABOVE
B
16 10000 New/Lube Oil
08/01/2001
ABOVE
A
4 1000 Vehicular Diesel
06/01/1978
UNDER
A
5 1000 Unleaded Gas
06/01/1978
UNDER
A

***Note:   Construction, Piping, and Monitoring Info not shown
                   for CLOSED tanks (Status of A or B).

Most Recent Insurance Document
FR Type Effective
Date
Expiration
Date
Company Name
None
 
Insurance
09/02/2018
09/02/2019
 Ace American Insurance Company
Insurance
09/02/2017
09/02/2018
 Ace American Insurance Company
Insurance
09/02/2016
09/02/2017
 Ace American Insurance Company
Insurance
09/02/2015
09/02/2016
 Ace
Insurance
09/02/2014
09/02/2015
 Illinois Union
Insurance
09/02/2013
09/02/2014
 Illinois Union
Insurance
09/02/2011
09/02/2012
 Illinois Union
Insurance
09/02/2010
09/02/2011
 Illinois Union
Insurance
09/02/2009
09/02/2010
 Ace

Open Violations

Insp Date Viol # Sig
Level
Violation Text
11/24/1997
906
N
(1991) Inventory Performance
11/24/1997
909
N
(1991) Record Keeping
11/24/1997
909
N
(1991) Record Keeping
11/24/1997
912
A
(1991) Release Detection Compliance - Significant
11/24/1997
914
N
(1991) System Performance - Minor
11/24/1997
915
B
(1991) System Performance - Significant
11/24/1997
919
N
(1991) Tank Out Of Service Status - Minor
06/04/1999
72
A
Category A Protected From Corrosion
06/04/1999
84
N
Written Release Detection Response Level For System
06/04/1999
88
B
Site Suitablity Determination (Usts By 12/31/1998, Asts By 1/1/2000)
06/04/1999
142
N
Line Leak Detector Can Detect 3.0 Gph Discharge
06/04/1999
157
N
Release Detection Devices Tested Annually
06/04/1999
170
N
Dated, Maintained In Permanent Form And Available In 5 Working Days
06/04/1999
171
N
Records Required To Be Maintained For 2 Years
06/04/1999
187
N
Unmaintained Usts Closed Within 90 Days Of Discovery
05/11/2000
1
N
Systems Registered; Fees Paid
05/11/2000
65
B
Shear Or Emergency Shutoff Valves Installed By 12/31/1998
05/11/2000
67
N
Fill Boxes Color-Coded By 12/31/1998
05/11/2000
76
A
All Systems Meet Requirements Of Table Ust
05/11/2000
86
B
Release Detection Performed At Least Once A Month
05/11/2000
87
N
Continuous Electronic Leak Detection Inspected Monthly
05/11/2000
119
N
Monitoring Well Construction Standards Met
05/11/2000
132
N
Inventory Control Maintained For Single-Walled Vehicular Systems
05/11/2000
142
N
Ust Line Leak Detector Can Detect 3.0 Gph Discharge, Tested Annually
05/11/2000
144
N
Repaired Component Which Has Or Could Cause A Discharge
05/11/2000
151
N
Inspected 6 Months After Installation Or Repair And Annually/3 Years
05/11/2000
157
N
Release Detection Devices Tested Annually
05/11/2000
170
N
Permanent Records Avaiable Within 5 Working Days Notice; Reasonable Facility Access
05/11/2000
171
N
Records Requiring 2-Year Documentation Period Kept By Facility
05/11/2000
172
N
Records Required For Life Of System Kept By Facility
05/11/2000
187
B
Unmaintained Usts Properly Closed Within 90 Days Of Discovery
11/29/2000
9
N
Incident Notification (Inf) In 24 Hours, Or Next Business Day
11/29/2000
86
B
Release Detection Performed At Least Once A Month
11/29/2000
87
N
Continuous Electronic Leak Detection Inspected Monthly
11/29/2000
91
B
Line Leak Detector Provided For Pressurized Piping
11/29/2000
119
N
Monitoring Well Construction Standards Met
11/29/2000
144
N
Repaired Component Which Has Or Could Cause A Discharge
11/29/2000
151
N
Inspected 6 Months After Installation Or Repair And Annually/3 Years
11/29/2000
170
N
Permanent Records Avaiable Within 5 Working Days Notice; Reasonable Facility Access
11/29/2000
171
N
Records Requiring 2-Year Documentation Period Kept By Facility
11/29/2000
187
B
Unmaintained Usts Properly Closed Within 90 Days Of Discovery
11/29/2000
197
N
Incident Promptly Investigated
11/30/2001
4
N
30 Day Notification Before Installation Or Upgrade
11/30/2001
5
N
10 Day Notification Before Api653 Ast Inspection/Ust Internal Inspection; Change In Service Status, Closure, Closure Assessment
11/30/2001
6
N
48 Hour Notification Before Installation/Closure Activity Begins
11/30/2001
8
N
30 Day Notification After Change Of Ownership, Closure/Upgrade, Change In Registration Or Financial Responsibility
11/30/2001
13
N
Exterior Coatings
11/30/2001
14
B
Spill Containment
11/21/2002
4
N
30 Day Notification Before Installation Or Upgrade
11/21/2002
8
N
30 Day Notification After Change Of Ownership, Closure/Upgrade, Change In Registration Or Financial Responsibility
11/21/2002
9
N
Incident Notification (Inf) In 24 Hours, Or Next Business Day
11/21/2002
10
B
Discharge Reporting (Drf) Within 24 Hours, Or Next Business Day
11/21/2002
14
B
Spill Containment
11/21/2002
60
N
Small Diameter Piping Pressurized: Shear, Emergency Shutoff Valves Properly Installed
11/21/2002
76
A
All Systems Meet Requirements Of Table Ust
11/21/2002
127
N
Visual Inspections Noted
11/21/2002
144
N
Repaired Component Which Has Or Could Cause A Discharge
11/21/2002
155
N
Spill Containment, Dispenser Liners And Piping Sumps Accessible; Water And Regulated Substances Removed
11/21/2002
170
N
Permanent Records Avaiable Within 5 Working Days Notice; Reasonable Facility Access
11/21/2002
171
N
Records Requiring 2-Year Documentation Period Kept By Facility
11/21/2002
172
N
Records Required For Life Of System Kept By Facility
11/21/2002
196
B
Closure Assessment Submitted Within 60 Days
11/21/2002
197
N
Incident Promptly Investigated
02/24/2004
4
N
30 Day Notification Before Installation Or Upgrade
02/24/2004
6
N
48 Hour Notification Before Installation/Closure Activity Begins
02/24/2004
8
N
30 Day Notification After Change Of Ownership, Closure/Upgrade, Change In Registration Or Financial Responsibility
02/24/2004
10
B
Discharge Reporting (Drf) Within 24 Hours, Or Next Business Day
02/24/2004
13
N
Exterior Coatings
02/24/2004
14
B
Spill Containment
02/24/2004
30
N
Tank And Integral Piping Tested Properly (Tightness Or Approved Test Method)
02/24/2004
34
N
Fillbox Covers Marked According To Api Rp 1637, Or Equivalent Method
02/24/2004
35
B
Ust Provided With Overfill Protection
02/24/2004
110
B
Single Walled Pressurized Piping Has Mechanical Leak Detectors / Annual Tightness Test, Or Electronic Leak Detector
02/24/2004
142
N
Ust Line Leak Detector Can Detect 3.0 Gph Discharge, Tested Annually
02/24/2004
144
N
Repaired Component Which Has Or Could Cause A Discharge
02/24/2004
157
N
Release Detection Devices Tested Annually
02/24/2004
170
N
Permanent Records Avaiable Within 5 Working Days Notice; Reasonable Facility Access
02/24/2004
171
N
Records Requiring 2-Year Documentation Period Kept By Facility
02/24/2004
185
N
Closure Assessment Required And Performed
02/24/2004
196
B
Closure Assessment Submitted Within 60 Days
12/14/2004
1105
N
Not Repaired Component Which Has Or Could Cause A Discharge
12/14/2004
2005
N
30 Day Notification Before Installation Or Upgrade Not Submitted
12/14/2004
2007
N
48 Hour Notification Before Installation/Closure Activity, Api 653 Inspection, Change In Service Status, And Tightness Tests Not Submitted
12/14/2004
2009
N
Registration Update After Change Of Ownership, Closure/Upgrade, Or Change In Financial Responsibility Not Submitted Within 30 Days
12/14/2004
2015
B
Impervious Spill Containment Not Installed Or Does Not Meet Standards
12/14/2004
2110
N
Not Repaired Component Which Has Or Could Cause A Discharge
04/17/2006
2015
B
Impervious Spill Containment Not Installed Or Does Not Meet Standards
04/17/2006
2110
N
Not Repaired Component Which Has Or Could Cause A Discharge
04/17/2006
2120
N
Spill Containment, Dispenser Liners And Piping Sumps Accessible; Water And Regulated Substances Not Removed


Discharge Information

Discharge
Date
Cleanup
Status
Score Eligibility Info Site Manager Phone
06/03/1987 Inactive 10 Early Detection Incentive-Partial Johnson_Pg (850)877-1133-3707


End of Data for Facility #: 8626382